Released: November 2026 | Availability: All CBAM Supplier accounts | Products: CBAM Supplier
The CBAM Supplier product is now aligned with the definitive-phase methodology for the iron and steel and aluminum sectors. You set up your production processes once per site, run a 2026 assessment on each, and see embedded emissions and free allocation adjustment per CN code.
What's new
Production processes per site
Describe how each site makes its goods, once. Go to Company and select the Production processes count of a site. Each process has a name, the CN codes it covers and one production route. All CN codes on a process must belong to the same goods category. If only one route applies, it is preselected.
A site that makes a good on two routes sets up two processes. Once an assessment uses a process, its CN codes and route are locked.
Assessments start from a process
New assessments use the EU CBAM (definitive) standard and a 2026 or custom reporting period. You choose a site outside the EU, then one of that site's production processes. The CN codes and route come from the process.
Only the sections your goods need
Production volume has one block per CN code, plus a block for non-CBAM goods made in the same process. Direct emissions show the sources that apply to your route, and each can be excluded. Electricity appears only where indirect emissions are in scope, such as sintered ore.
There is no review step: save, then run the calculation.
EU default values for precursors
No more manual lookups. Add a purchased precursor with its country, goods category and CN code. With Default values, the specific embedded emissions, benchmark and production route indicator fill in automatically. With Actual values, you enter your supplier's figures, including free allocation.
Indirect emissions show "n/a" where they do not apply. If you do not know the country of origin, choose Unknown.
Results per CN code
Product emissions shows one row per CN code, site and reporting period, with direct, indirect and total specific embedded emissions and free allocation. A Per product view lists the same results by product.
Several processes making the same CN code at one site are combined, weighted by production volume.
Where indirect emissions are out of scope, they read "out of scope" and are not added to the total.
Improvements
The product form tells you whether a production process covers the product, and lets you add one in place.
Production volumes can be entered in other mass units and are converted.
The CBAM assessments list shows the standard (transitional or definitive phase) of each assessment.
Limitations
Only the iron and steel and aluminum sectors are in scope. Cement, fertilizers, hydrogen and electricity are out of scope.
Only calculation-based methods are supported, not measurement-based methods.
Some cases of the calculation-based method, such as measurable heat and custom biomass fractions of fuels, are not supported.
The solution covers EU CBAM, not UK CBAM.
Assessments for the definitive period can be created starting with the year 2026. Years after the current one cannot be selected yet.
The Communication template can no longer be uploaded. The template was valid for the transitional phase, and no version for the definitive phase exists.
All results are unverified. To use results in a CBAM declaration, additional documentation and verification by an accredited verifier are required.
Sending definitive-phase figures to importers through the API is planned separately.
Plausibility checks do not run on definitive-phase assessments yet. Review your inputs before you run the calculation.
Production processes cannot be deleted yet, and a refused calculation does not always say why.
Questions or access requests: contact your account team.